![]() |
||
|
|
49th Ward Community Vote1. 62% to Treet resurfacing and streetlighting projects
2. Urgent Sidewalk Repairs 3. Cobblestone Restoration on Glenwood (west of tracks) from Farwell to Lunt 4. Sheridan Road Pedestrian Safety Engineering Study 5. Touhy Park Cherry Blossom Trees and Water Fountain 6. Shared Bike Lanes on Clark from Howard to Albion Check out the complete results here! |
PB 49 Sample Ballot - Download itThe Sample Ballot has all the final projects and information that the Final Ballot will contain. Final Ballots will only be distributed to residents at the time of voting.
|
